Vis Consultants

Cost-Benefit Analysis study for phase 1 of the Midcat gas pipeline project (STEP) published by EC

VIS as part of a Pöyry Management Consulting led consortium completed a Project Specific CBA (PS-CBA) in line with the European Network of Transmission System Operators for Gas (ENTSOG) methodology, for phase 1 of the Midcat gas pipeline project in the Eastern Pyrenees – the South Transit Eastern Pyrenees (STEP).